Mohan Ummed Building AssociatesSukhveer Singh – Mohan Ummed Building Associates
Sukhveer Singh is the founder and driving force behind Mohan Ummed Building Associates, a well-established firm engaged in civil infrastructure and bridge construction works across India. Under his leadership, the company has successfully executed reinforcement, shuttering, formwork, and concrete works for several prestigious national highway and bridge projects.
Ongoing PROJECT
PNC Infratech | May 2025 – Ongoing
Construction of Access Controlled Pune Ring Road (PRR-E2), Indori to Chimbali, Pune District.
RRSM Infra | Feb 2024 – Ongoing
Construction of Six-Lane Elevated Corridor on NH-66, Goa (EPC Mode).
Ashoka Buildcon | Apr 2024 – Ongoing
Design & Construction of Stilt Bridge (SBR-9) for NMIA Eastern Connectivity, Navi Mumbai.
Project (Completed) | May 2022 – Sept 2024
Construction of Six-Lane Link Road (NH-166S) to Mopa Airport, Goa (EPC Mode).
Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR) Section C-3
November 2025 to ongoing
Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR) Section C-4
March 2023 to ongoing
The firm has contributed to major projects such as the Six-Lane Access Controlled Highway NH-152D (Haryana) under Bharatmala Pariyojana, Nagpur–Mumbai Super Communication Expressway, Six-Laning of Nidagatta–Mysore Section NH-275 (Karnataka), Bhilwara High Level Bridge over Kothri River, Road Over Bridge (ROB) at Bhilwara, Rajasthan, and RGS Detour works connected with DFCCIL.
Major Projects Executed
1. Six Lane Access Controlled Highway (NH-152D), Haryana
Construction from Rewari–Kanina Road (SH-24) near Kanina to Narnaul under Bharatmala Pariyojana (EPC Mode).
Client: M/s Dhatarwala Shiv Shiva (JV)
Scope: Reinforcement, shuttering & concrete of foundations, pier shafts, pier caps, deck slabs, crash barriers & girders.
Duration: June 2021 – November 2023
2. Nagpur–Mumbai Super Communication Expressway
High-speed expressway project involving major bridge structures.
Scope: Reinforcement, shuttering & concrete of foundations, piers, deck slabs, crash barriers & girders.
Duration: May 2019 – May 2020
3. Six Lanning of Nidagatta–Mysore Section (NH-275), Karnataka
National highway widening project.
Client: M/s Dilip Buildcon Ltd.
Scope: Foundation, pier shafts, pier caps, deck slabs, crash barriers & girders.
Duration: June 2022 – August 2023
4. Bhilwara High Level Bridge (Kothri River), Rajasthan
Client: M/s Ravi Infra Build Projects Pvt. Ltd.
Scope: Reinforcement, shuttering & concrete of deck slabs, crash barriers & drainage spouts.
Duration: June 2022 – November 2023
5. Road Over Bridge (ROB), Bhilwara – NH-79
Connection to Ring Road at Jodhras Chauraha.
Client: M/s SGCCL–MMPL (JV)
Scope: Foundations, pier shafts, pier caps, deck slabs, crash barriers & RCC girders.
Duration: May 2023 – May 2024
6. RGS Detour in Connection with DFCCIL Work
Client: M/s MHK at PLT (JV)
Scope: Reinforcement, shuttering & concrete of foundations, piers, deck slabs & crash barriers.
Duration: June 2017 – March 2019
Ward No.07,Dhani-Urjanwala,VPO-Gadrata,Khetri, Jhunjhunu (Raj.)-333501
QR Code
Our Services
Gallery
Testimonials
Blog
Inquiries
Made By Ramcode Solutions Pvt Ltd
ZH
EN
FR
DE
PT
RU
ES
TR
HI
IT
VI